CVI testing at production facilities

Testing of the compressor odd railroads hump yard of the Kinel station of the Kinelsky alarm, centralization and lockout distances
Test period
September 30, 2019 to October 10, 2019 - 2 cycles of 5 days each
Equipment used
2VM2.5 compressor - equipped with an electric motor with a power of 160 kW, 750 rpm
Equipment tested
Current and voltage integrator ITN-160
Measuring devices
Electric energy quality meter - C.A 8335 Electric energy meter - SET - 4ТМ.03М.
Click image to enlarge
Made on
Tilda